Not the average architect. Not the average contractor.
Expertise: One Mind Across Design, Construction and the Contract
On most projects, the architect understands architecture, the contractor understands construction, and the contract sits between them, often understood fully by neither. Our Senior Architect holds all of it in one head: design, building, construction management, development, and the agreements that bind them.
Architecture and general inquiries: (949) 606-7300. Construction: (949) 606-7333. Tell us about your project.
Licensed Architect C-33953 · Licensed General Contractor CSLB 876748 · Irvine, California
What makes MBARCHAA's knowledge different?
Most owners hire an architect who knows design, then a contractor who knows building and cost, and hope the two understand each other. Our Senior Architect is both a licensed architect (C-33953) and a licensed general contractor (CSLB 876748), and has studied how the architect-side and contractor-side standard forms differ. That is One-Mind Delivery: designed once, priced from the first sketch, with no one to pass the blame to.
Why separate roles cost owners money
A building project has many experts. Each one is good at their part. The trouble is the seams between the parts.
- The architect draws what should be built and writes the specifications.
- The contractor decides how to build it and what it costs.
- A construction manager may coordinate the two for the owner.
- The contract decides who is responsible when the two disagree.
When these are different people, each has to guess what the other is thinking. A question on the drawings becomes a request for information that waits in someone's inbox. A gap between design and workmanship becomes an argument about whose fault it is. What happens next is a familiar pattern: each side shifts responsibility to the other. We think the fix is not a better referee. It is fewer seams. One-Mind Delivery. design-build done our way.
Four fields, one mind
Our Senior Architect works in all four of the fields that usually belong to four different people.
| Field | What that discipline has to know | Why an owner cares |
|---|---|---|
| Architecture | Design, codes, drawings and specifications, and how a building should perform. | The design starts from your site, program, and budget. |
| General contracting | Means and methods, sequencing, subcontractors, real costs, and field conditions. | The drawings are drawn to be built, not only to be approved. |
| Construction management | Schedule, budget control, procurement, and coordination of trades and consultants. | One person watches cost and time while the design is still easy to change. |
| Development | Site and feasibility thinking, entitlements, budgets, and how a project pencils out for the owner. | The building is shaped by what the project has to achieve for you. |
Knowing a neighboring field from a book is common. Having to answer for it, on the same project, under his own two licenses, is not. Drawn by the hand that builds it.
Two contract families, and why the difference matters
Most owners never read the contract between themselves and their architect. They should, because it decides who carries which risk.
Two families of standard agreements dominate the industry. They are written by two different industry groups, each looking after its own members.
The AIA documents come from the American Institute of Architects. For the owner-architect agreement, the AIA form is the B101 series (earlier editions: B141).
The contractor-side documents come from the Associated General Contractors of America. Their owner-architect/engineer agreement is AGC Document 240, now published by ConsensusDocs as ConsensusDocs 240.
Research thesis (2015): Architect's Hidden Liabilities compared the two. In the editions studied then, the families start from different ideas. In that reading, the contractor-side form leans toward the owner, and the AIA form leans the other way. The conclusion was careful: nobody can say one is fair and the other is not. They differ, and each one changes who carries risk.
Six differences that show up on a real project
As studied in 2015, using the owner-architect forms of that time. This is not legal advice. Standard forms are revised regularly, so read the current edition and have an attorney review any contract you sign.
| Topic | AIA owner-architect form (as studied in 2015) | Contractor-side form, AGC 240 (as studied in 2015) | What it means for an owner |
|---|---|---|---|
| Design errors and omissions | No set cost-sharing term for design errors. | Names a cost threshold for design errors and omissions tied to a percentage of the design fee. | Tells you up front how error costs are handled, instead of finding out in a dispute. |
| Construction documents | Does not spell out a code-compliance promise for the documents. | States that the documents must comply with applicable code and law in force when they are prepared. | Decides whether meeting code is a stated duty or an argument later. |
| Site visits | Periodic visits to observe the work. | Similar visits, plus written reports of the visits and a duty to give prompt written notice of a safety violation the architect actually knows about. | Decides what the architect must tell you, and what a visit record can later be used to prove. |
| Payment approval | Architect certifies the contractor's payment applications. | Architect recommends payment to the owner, with no duty to verify payments to subcontractors. | Decides how much weight a signed payment approval carries, and who else may rely on it, such as a surety. |
| Architect delay | Both parties waive consequential damages. | Architect compensates the owner for costs that result from the architect's delay. | Decides who pays when design delay costs the owner money. |
| Disputes | Parties share mediation and filing fees equally. | Losing party bears the cost of resolution. | Changes how expensive it is to push back, or to be pushed. |
A contract written by someone who only understands one side tends to protect that side. When the same person understands the architect's duties, the builder's duties, and the owner's exposure, the agreement can be written to fit the project instead of to win an argument later.
This does not replace your attorney. It means the person drafting the design side of your project already knows what each clause does on the construction side.
The professional-practice knowledge behind the work
Our Senior Architect studies and cites the Project Resource Manual published by the Construction Specifications Institute (CSI), fifth edition, a construction-industry reference for how a project moves from idea to completion. We use it as a shared vocabulary. These are the parts that matter most to owners, in our own words.
How a project is bought
The manual describes five ways to deliver a project: design-bid-build, design-negotiate-build, construction management, design-build, and owner-build. Each splits responsibility differently, and the owner's choice shapes cost, schedule, and who answers for what. It also shows that design-build is not one thing: it may be led by an architect, a contractor, a joint venture of the two, or a single company doing both in-house. On a typical design-build job the architect is part of the builder's team and not the owner's representative, which is a difference many owners are not told about. One-Mind Delivery sits at the simplest end of that range: one licensed person, one agreement.
Before design starts
Defining the project, checking the site and its limits, setting a realistic budget and schedule, and deciding what the finished building has to do. Decisions made here are the cheapest to change, which is why we price from the first sketch.
Getting the documents right
The drawings say what to build and the specifications say with what and how. The manual stresses that each requirement should be stated once and in the right place, and that the contract conditions, the general requirements, and the technical sections each have their own job. That discipline, with the industry's standard numbering, is what lets every trade and every bidder read from the same page.
Substitutions, submittals, and close-out
How a product is proposed and approved, how shop drawings and samples are reviewed, and what is delivered at the end: record documents, operation and maintenance data, warranties, and lien releases. These are the quiet steps where small mistakes become expensive.
Risk, insurance, and who answers to whom
The manual treats the owner's objectives, the team's roles, and insurance as decisions made with the design, not afterthoughts. For example, it notes that professional liability insurance for design errors differs from ordinary contractor insurance, and that this matters most in design-build. They are worth raising in the first meeting, not after a problem, and we are glad to walk through them.
Read the design-build comparison.
CSI and MasterFormat are trademarks of the Construction Specifications Institute. MBARCHAA is not affiliated with CSI. We refer to its published manual only as a professional reference.
Research thesis (2015): Architect's Hidden Liabilities
Architects take on responsibilities and legal exposure the moment they accept a job, often without realizing it. This research surveys the main sources of an architect's liability: copyright in design work, the terms of the contract, implied terms and warranties, negligence and the standard of care, and interference with other parties' contracts. It also covers defenses the law offers, including statutes of limitation and repose, certificate-of-merit and Good Samaritan statutes, and several kinds of immunity. Using a comparison of the AIA and AGC owner-architect agreements, it argues that an architect who understands these liabilities writes clearer contracts, defines services more carefully, and manages risk better. The law changes quickly, and no single source covers all of it.
- The research uses the delivery method, how a project is bought and organized, as its main lens for spotting problems early.
- When design and workmanship meet, responsibility tends to be shifted rather than shared. One mind removes the person to shift it to.
- The owner is often the least experienced party on the team. A good team recognizes that and plans for it.
- Contract wording matters more than most people think, including what it implies without saying it.
Research thesis (2015): Architect's Hidden Liabilities is summarized on this page to show how we think. It is not legal advice, and laws and standard forms change. Consult an attorney about your own contract. The thesis file is not posted here.
One mind versus two
| Separate architect and contractor | One-Mind Delivery | |
|---|---|---|
| Who knows the contract? | Each knows their own side. | One person knows both sides and the owner's. |
| Design meets cost | When drawings are finished and bid. | From the first sketch. |
| Where the design and workmanship line is drawn | Negotiated, often in a dispute. | Decided by one person before the work starts. |
| Questions in the field | Written, routed, and waited on. | Answered by the person who drew it. |
| When something goes wrong | Finger-pointing across firms. | One person answers. |
Want only part of this? Design only and construction only are both available. Construction management on its own is available too. We also build from other architects' drawings, and we welcome developers.
Where this matters most
- Homeowners: a simpler path from idea to keys, and a design that can be priced while it is still a sketch.
- Developers and investors: one decision-maker who understands design, cost, schedule, and the agreements that connect them.
- Business owners: fewer parties to coordinate on a project that has to keep moving.
- Owners who already have drawings: a builder who can read them as a designer would.
Frequently asked questions
What does "one mind" mean?
It means the architect, the general contractor, the construction manager, and the person watching the project's budget are the same licensed person. Our Senior Architect holds a California architect license (C-33953) and a California general contractor license (CSLB 876748), so design, cost, and construction are decided together instead of handed from one party to the next.
What is the difference between AIA and AGC (ConsensusDocs) contracts?
They are two families of standard construction agreements. The AIA documents are written by the American Institute of Architects. The AGC documents, now published as ConsensusDocs, are written by the Associated General Contractors of America and its partners. Each family tends to look after its own side. In the owner-architect forms our Senior Architect studied in 2015, they differed on who bears the cost of design errors, whether code compliance is stated as a duty, what the architect must report from site visits, how payment is approved, who pays for architect delay, and who pays the cost of a dispute.
Which one is better for an owner?
Neither is simply better. Each reflects the interests of the group that wrote it, and either can be modified. What matters is that the owner understands what the chosen forms say and has an attorney review them. We are happy to explain what a clause means for your project. This is not legal advice.
Why does it matter who wrote my contract?
Because the contract decides who carries which risk, including some risks that are not written down but implied. A contract drafted by someone who understands the architect's side, the builder's side, and the owner's side is less likely to leave a gap for a dispute.
Is this legal advice?
No. We are an architecture and construction firm. Research thesis (2015): Architect's Hidden Liabilities and this page explain how standard forms and professional practice work, to help you ask better questions. For your own contract, talk to your attorney.
What is the CSI Project Resource Manual?
It is a reference book published by the Construction Specifications Institute on how construction projects are planned, documented, bought, and built, from the first idea through operation of the finished building. We use the fifth edition as a professional reference. This page paraphrases its ideas and does not reproduce it.
What is design-build, and how is One-Mind Delivery different?
Design-build means one agreement covers both the design and the construction. On many design-build projects, the architect, engineers, manager, and builder are still separate parties. One-Mind Delivery is design-build done by one licensed architect who is also a licensed general contractor. See design-build compared with One-Mind Delivery.
Can I hire you for just design or just construction?
Yes. Design only and construction only are both available, and so is construction management on its own. If you already have drawings from another architect, we can build from them.
Can I read the thesis?
Research thesis (2015): Architect's Hidden Liabilities is summarized on this page. The thesis file is not posted here. The summary is not legal advice.
How do I check your licenses?
Search C-33953 on the California Architects Board license lookup and CSLB 876748 on the Contractors State License Board license check. We encourage this for any firm you hire.
Licensed and checkable
Both licenses are held by Mustafa Bdaiwi, sole proprietor. Construction is performed by him personally under CSLB 876748. Architecture services are provided through MBARCHAA (Mustafa Bdaiwi Architect and Associates Inc.), Irvine, California.
California Architects Board license lookup Contractors State License Board license check